Water pipe laid in an open trench

Pipe Fall Calculator

Work out the fall, grade or maximum run length of a drain or sewer pipe. Enter grades as a percentage, 1 in X or mm per metre, and check them against common minimums by pipe size.

1

What do you want to find?

2

Pipe size

Used to compare your grade with the common minimum for that size.

3

Measurements

m
%
mm
Grade entered as
Quick answer: fall = length × grade. A 10 m DN100 drain at the commonly cited minimum of 1.65% (about 1 in 60) needs 165 mm of fall, a DN65 at 2.5% needs 250 mm and a DN150 at 1% needs 100 mm.

What is pipe fall and grade?

Drain and sewer pipes rely on gravity, so each pipe has to slope down towards the sewer connection or point of discharge. Plumbers describe that slope in two related ways:

Fall

The total drop from one end of the pipe to the other, usually in millimetres. A 10 m pipe that is 165 mm lower at its far end has 165 mm of fall.

Grade

The slope itself: fall divided by length. It is written as a percentage (1.65%), a ratio (1 in 60) or millimetres per metre (16.5 mm/m).

Invert

The inside bottom of the pipe. Levels and falls are measured to the invert, not to the top of the pipe or the trench floor.

How to calculate the fall of a pipe

STEP 1Measure the run length in metres, along the line of the pipe.
STEP 2Turn the grade into a decimal: 1.65% = 0.0165, or 1 in 60 = 1 ÷ 60.
STEP 3Multiply: length × grade = fall in metres. × 1,000 for millimetres.

For example, a 15 m DN100 drain at 1.65%: 15 × 0.0165 = 0.2475 m, so about 248 mm of fall. To find the grade from a fall you already have, divide instead: 300 mm over 12 m is 0.3 ÷ 12 = 0.025, or 2.5%. And to see how far a pipe can run with the fall available, divide the fall by the grade: 0.2 m ÷ 0.0165 = about 12.1 m.

Grade conversion table: percent, 1 in X and mm per metre

PercentRatiomm per metreFall over 10 m
1%1 in 10010 mm100 mm
1.25%1 in 8012.5 mm125 mm
1.65%about 1 in 6016.5 mm165 mm
2%1 in 5020 mm200 mm
2.5%1 in 4025 mm250 mm
5%1 in 2050 mm500 mm

Percent = 100 ÷ X for a grade of 1 in X. Exactly 1 in 60 is 1.67%; plumbers in Australia usually round the DN100 minimum to 1.65%.

Minimum grade for drains and sewer pipes in Australia

Sanitary drainage in Australia is covered by the Plumbing Code of Australia and AS/NZS 3500.2. These are the minimum grades most often quoted from it for sanitary drains:

Pipe sizeMinimum gradeFall per metre
DN652.5% (1 in 40)25 mm
DN1001.65% (about 1 in 60)16.5 mm
DN1501% (1 in 100)10 mm

The standard has exceptions and other rules that a minimum grade alone doesn't capture, such as how branches join a drain, depth of cover, and different requirements for stormwater (AS/NZS 3500.3). The current edition is AS/NZS 3500.2:2025. In Victoria, for example, work started on or after 20 October 2025 must comply with it.

A guide, not a compliance check This calculator compares your grade with commonly quoted minimums only. Your licensed plumber or drainer is responsible for designing and certifying drainage that meets the Plumbing Code of Australia and your local water authority's requirements.

How to set out the fall on site

  • Start from the connection point. Find the depth of the sewer connection or inspection opening first and work uphill, so you know the fall you actually have.
  • Measure to the invert. Take levels to the inside bottom of the pipe, allowing for pipe wall thickness and bedding.
  • Use a laser or string line. Set the level at each end and check the grade along the trench, not just at the ends.
  • Avoid sags and humps. A dip in the middle of a run holds water and waste even when the overall fall is right.
  • Record the levels. Note invert levels and lengths for the as-built drainage plan your plumber submits.
Drainage work needs a licensed plumber or drainer Sanitary plumbing and drainage must be done by a licensed professional in every Australian state, and is usually inspected before it is covered. Moving a toilet or shower in a renovation? See what it adds with the bathroom renovation cost calculator.

How we calculate

  • Fall: length (m) × grade (decimal) × 1,000 = fall in mm.
  • Grade: fall (mm) ÷ 1,000 ÷ length (m), shown as a percent, 1 in X and mm per metre.
  • Run length: fall (mm) ÷ 1,000 ÷ grade (decimal).
  • Depth at low end: depth at the high end plus the fall, assuming the ground is level.

Minimum grades as published in AS/NZS 3500.2 and summarised by CCC Engineering (Dec 2025). Current edition checked on the Building and Plumbing Commission (Victoria) in November 2026.

Frequently asked questions

What is the minimum fall for a 100 mm sewer pipe in Australia?

The commonly cited minimum grade for a DN100 sanitary drain under AS/NZS 3500.2 is 1.65%, about 1 in 60. That is 16.5 mm of fall for every metre of pipe, so a 10 m run needs at least 165 mm of fall. Some conditions allow a different grade, so confirm with your plumber.

How do I convert 1 in 60 to a percentage?

Divide 100 by the second number: 100 ÷ 60 = 1.67%. To go the other way, divide 100 by the percentage: 100 ÷ 2.5 = 40, so 2.5% is 1 in 40. In millimetres, a percentage × 10 gives the fall per metre, so 2.5% is 25 mm per metre.

What is the difference between fall and grade?

Fall is the total height difference between the two ends of a pipe, usually in millimetres. Grade is the slope, the fall divided by the length, written as a percentage, a ratio such as 1 in 60, or millimetres per metre. The same grade gives more fall on a longer run.

How much fall does a 150 mm drain need?

The commonly cited minimum for a DN150 sanitary drain is 1%, or 1 in 100. That is 10 mm per metre, so a 20 m run needs at least 200 mm of fall.

Can I lay my own sewer or drain pipes?

No. In every Australian state, sanitary plumbing and drainage must be done by a licensed plumber or drainer, and the work is usually inspected or certified. Use this calculator to plan levels and check a design, not to do the work yourself.

Results are estimates to help you plan and compare quotes. They are not a substitute for advice from a licensed tradesperson or engineer.

Tiler pressing a wall tile into place

Planning new drainage?

Get a licensed plumber or drainer to design and lay it

Read the checklist